The original layout of the bathroom had a separate toilet off the hallway entrance, a bath along the side wall, a sink under the window and a cupboard in the corner containing the old boiler. We removed the wall dividing the bathroom and the toilet, stripped back the layer of old plaster, re-configured the bath and sink and accommodated a new separate shower in the now, much larger, bathroom. Works are currently ongoing on this project, updates to follow.

Existing Bathroom Layout

Proposed Floor Plan

Concept

Finishes Schedule

Bespoke Design Shower Detailing

Project Detailing and Timescale
Have a project in mind?
